Customization: | Available |
---|---|
Application: | Industrial |
Speed: | Low Speed |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Krubo specializes in designing and manufacturing high-performance Blowers and Cooling Fans.
Our diverse range includes DC fans, EC fans, AC fans, and fan motors. These products are integral to Clean Room MAU and AHU systems, HVAC, refrigeration, electronic devices, driver modules, frequency converters, power modules, control cabinets, and chassis cabinets.
What is an AC Shaded-pole Motor?
The Shaded-pole motor, an original type of AC single-phase induction motor, comes in three varieties: single-phase induction motor, commutator-type single-phase motor, and single-phase synchronous motor. Single-phase induction motors are further classified into split-phase motors, shaded pole induction motors, reluctance start induction motors, and repulsion start induction motors.
Highly popular for ratings below 0.05 HP (~ 40 W), shaded pole motors boast simple construction and self-starting capability, achieved through a copper ring shading one of the poles. Typically manufactured with small ratings, these motors excel in fractional horsepower applications, making them essential for operating single-phase AC motors.
Advantages of Shaded-pole Motors
Maintenance-free and low-cost
Reliable construction
Cost-effective
Compact size
High torque
Long service life
Applications of Shaded-pole Motors
AC Fan Motors are invaluable in homes, offices, businesses, and more. They are extensively used in fans, vacuum cleaners, refrigerators, blowers, washing machines, and radiator evaporators.
Business Type: | Manufacturer / Factory, |
Main Products: | Centrifugal Fans, Axial Fans, Duct Fan, EC Fan, Cross Flow Fan, Q Motor, etc. |
Registered Capital: | 2,000,000 RMB |
Plant Area: | >20,000 square meters |
Management System Certification: | ISO 9001, QC 080000 |
Average Lead Time: |
Off Season Lead Time: within 15 workdays Peak Season Lead Time: one month |